Recently our Bolting team has done job in Aktobe region at the one of compressor stations.

Recently our Bolting team has done job in Aktobe region at the one of compressor stations. The job was to untighten compressor cover using Hydraulic wrench and tight back once maintenance has finished. Job was done successfully and safely on time

December, 2019. Mangistau region. Carried out work on the bolted joints with hydraulic wrenches with a controlled torque value.

 

Scope of the work is to tighten the joints of metal structures evenly and with a fixed torque,to ensure the reliability of the installation of containers on the offshore platform further.Involved 2 specialists of the RT Alliance staff and set of hydraulic torque equipment Torsion-X.Along the perimeter of five containers our specialists tightened more than a thousand joints.