Recently our Bolting team has done job in Aktobe region at the one of compressor stations.

Recently our Bolting team has done job in Aktobe region at the one of compressor stations. The job was to untighten compressor cover using Hydraulic wrench and tight back once maintenance has finished. Job was done successfully and safely on time

December, 2019. Mangistau region. Carried out work on the bolted joints with hydraulic wrenches with a controlled torque value.

 

Scope of the work is to tighten the joints of metal structures evenly and with a fixed torque,to ensure the reliability of the installation of containers on the offshore platform further.Involved 2 specialists of the RT Alliance staff and set of hydraulic torque equipment Torsion-X.Along the perimeter of five containers our specialists tightened more than a thousand joints.

 

In early November 2019, our company specialists carried out work to detect leaks on a 6″ underground pipeline at a field in the Atyrau region of the Republic of Kazakhstan.

As known when hydrotesting underground pipelines, it is impossible to determine the leak location without opening the soil along the pipeline, which can entail huge losses of time and money. In this case, our specialists discovered the location of leakage using high-tech equipment without opening the ground, which was complicated by weather conditions – unprecedented snow and snowstorm for th region found during the work.